Richfield Secretary Office Remodel

Project Description

255 S. Main

Richfield, UT 84701


Central Utah Counseling Center (CUCC) is accepting bids from licensed contractors for a remodel project in Richfield.  This document and the accompanying plans detail the scope of the project. CUCC is undertaking this project in an effort to increase the safety, confidentiality and ease of communication in the secretary work space in our Richfield office by relocating one of the secretaries within the work space. Please check this webpage for any project updates as items may be added prior to April 30th. Please deliver sealed bids to 255 S. Main Richfield, UT. Bids will be accepted until 1:00 PM Monday April 30th, 2018.


Project Description:

  • Contractor shall have a current contractors license in the State of Utah.

  • Contractor shall be responsible to obtain any necessary permits for the project.

  • Plans indicate that the existing millwork is to be disposed.  CUCC will retain existing millwork and reuse in another location.

  • Contractor shall install new door between the hallway and the storage room as per plans.  Door to match other doors in building, frame to match current dutch door frame. Current door to storage room could be reused for this door.

  • Contractor shall install new network connections on west wall of storage room.  Connections are not shown on the plans. Connections shall be in a single gang electrical box with two Cat 5 wires that run to the network closet in the kitchen.

  • Contractor shall install new network connections under the desk space of the relocated secretary.  Connections shall be in a single gang electrical box with four Cat 5 wires that run to the network closet in the kitchen.

  • Contractor shall install a new three way switch for lights in storage room. Location to be near the new hallway door.

  • Contractor shall install new single gang electrical outlet under relocated secretary desk space.

  • Contractor shall install new commercial grade low nap carpet in secretary office and storage room.  Color/pattern to be selected by CUCC. Contractor shall make necessary modifications to concrete floor joints in center of secretary office to allow proper carpet installation.

  • Contractor shall address electrical connections under current secretary work space to be in electrical code compliance with new cabinets that may cover outlets.

  • Project shall be completed prior to June 30th, 2018.